Lagerung/Montage

Videos about storage and installation

Rapper Yepha has acoustic panels installed in his studio

See how acoustic panels can transform both the appearance and the sound experience of a creative space.

How to install FibroTech acoustic panels correctly

Get a practical walkthrough of measuring, cutting and installation.

FibroTech panel installation

Watch FibroTech’s installation video on YouTube, focusing on correct handling and installation of the panels.

Before installing the panels

Good installation starts with correct storage, preparation and inspection of the substrate. Always use the relevant installation guide for the specific product.

Acclimatise the panels

Place the panels in a garage, carport or other covered area for 48 hours before installation.

Check the substrate

Make sure the surface is dry, clean, level and stable before installing the panels.

Cut from the back

The panels can be cut to height from the back using a fine-toothed blade and lightly sanded after cutting.

Use the correct fasteners

For wall installation, the panels can be spot-glued or screwed in place. For ceilings, both screws and adhesive must always be used.

FibroTech panel installation

Here you will find all the relevant documents in one place, making it easy to open the correct guide before storage, preparation and installation.

SPC Panels Installation

SPC Panels Installation DIY

ALU thermowood installation guide

Panels Installations guide

Accessory box installations guide

FireGuard Installations guide

Practical advice for a better result

Small preparations make a big difference. Here are the most important things to remember before installing the panels in the project.

Can the panels be installed vertically and horizontally?

Yes. Start by measuring and choose the direction the panels should face. Always use a spirit level and plumb line.

How is the width adjusted?

Adjust the width by cutting the polyester backing with a utility knife.

What should you be aware of in damp rooms?

In rooms with high humidity, materials, edges and joints should be protected in accordance with the relevant guide. Always ensure correct sealing, good ventilation and a dry, stable installation surface.